Identify which system is authoritative for document approval, version and release status, and which information the ERP needs to reference. Define permissions and change notifications before connecting them. The acceptance test should prove that an obsolete or withdrawn document cannot be mistaken for current approval simply because an earlier file remains attached to an order.
Understand the decision
A document-management system contains the approved supplier certificate while the sales team keeps a downloaded copy. A later revision changes its status. The integration review should follow that change to affected operational decisions without assuming that storing a PDF in Odoo reproduces the controls of the quality system.
Work through the requirements
- Assign authority for document status and version
- Define approved references and access boundaries
- Test withdrawal and revision notifications
| Record or decision | Why it matters |
|---|---|
| Authoritative document reference | Points to the controlled source |
| Version-status mapping | Explains the meaning of shared status |
| Change impact queue | Identifies affected operational work |
What would a passing test show?
Use these hypothetical cases in a demonstration. Mark the evidence you have reviewed, then download the checklist. Selections stay in this tab.
Watch for this failure
A copied attachment can become stale without changing its filename. Do not equate file availability with approval, and do not claim an ERP connection preserves a validated quality process until the responsible team has evaluated the actual controls.
Continue the evaluation
This example defines what to verify, rather than promising a particular Odoo feature. Keep a record of the demonstrated result, configuration, unresolved gaps and person who accepts it.
Read the wider implementation guideBring your workflow to the conversation.
Discuss requirements for Medical supplies distribution in a business needs review. Start with your current systems, the handoff that fails and the result you need to prove.
Sources & scope
The linked product documentation is a starting point for validating your chosen version, edition, apps and hosting. The scenarios and acceptance criteria are editorial planning guidance, not customer case studies or a guarantee of built-in functionality. See how this library is prepared.
Lot numbers ↗Serial numbers ↗Expiration dates ↗